- resealed all the exterior seams to create a water tight bond
- resealed all windows and doors
- replaced all 4 tires
- replaced vent pipes on roof
- replaced skylights
- removed old antennae and cable lines
- gutting interior (we only saved the bathroom wall panels, bathroom and kitchen sinks, shower pan, and stove vent/master panel)
- applied Kilz paint/primer to everything
- painted interior walls, ceiling and bathroom wall panels
- installed Bamboo flooring thru-out
- removed old water heater and replaced with new Tankless Water heater
- removed furnace and air ducts
- removed stove/oven and replaced with new stovetop range (no oven)
- built main (queen) bed frame with hinged panel and underneath storage room
- built sofa/extra (twin) bed frame with hinged panel and underneath storage room
- elevated and installed bathroom sink (for us tall people), reinstalled bathroom panels
- fiberglass patched the shower pan and coated with faux porcelin finish
- ran new plumbing through trailer
- installed new kitchen counter, kitchen sink and stovetop range
- built framing for closet and pantry area
Hopefully this week we have the following finished, which will make our trailer move-in ready...
- install new Air Conditioner
- run propane lines
- check all electric interior and exterior lights
- install new fridge and fridge vent
- finish kitchen cabinets
- finish bathroom cabinets
- install shower pan and new toilet
- install new door lock
- build front bookshelf
- finish construction of back bumper